Ease of Doing Business


The following listing wil help Industries in finding and following the relevant procedures that are instituted to facilitate "Ease of Doing Business" in the Yamuna Expressway Area.

The content is divided in to relevant sections. Please click the section heading to see details.

100

WELL-DEFINED INSPECTION PROCEDURE (BEFORE GRANTING CONSTRUCTION PERMITS)

Download Annexure 1

MANDATORY PROVISION FOR SITE VISIT- INSPECTION � CHECKLIST (BEFORE GRANTING CONSTRUCTION PERMITS)

Download Annexure 2

101

COMPUTERIZED SYSTEM FOR IDENTIFYING BUILDING / AREA THAT NEEDS TO BE INSPECTED BASED ON RISK ASSESSMENT

Through the 'Computerized Allocation of Inspector' the Application for obtaining Construction Permit is allocated to Inspector. Inspector need to conduct Site visits fulfilling the provisions of Site visit in the Building Byelaws.

Risk Management System

Risk Assessment Report

102

INSPECTION REPORTS (within 48 hours to the Department after Site visit before granting Construction Permits)

A system has been developed internally. Once the Allotee apply for the obtaining construction permit, the Inspection shall be done as per the Mandate. An office order has been issued for online submission of inspection report within 48 hours to the Department.

Download Annexure 102

103

INSPECTION REPORTS (of the Past two years)

A system has been developed internally. Once the Allotee apply for the obtaining construction permit, the Inspection shall be done as per the Mandate. The Inspection Report after Site Inspection before obtaining Construction Permit shall be uploaded on website within 48 hours. Allottee / Establishment has to login with his ID number and can find his inspection report in the property column. The report can also be downloaded from there.

104

PROCEDURE OF THE COMPUTERIZED ALLOCATION OF INSPECTORS

Download Annexure 3

111

WELL-DEFINED INSPECTION PROCEDURE (BEFORE GRANTING OCCUPANCY/ COMPLETION CERTIFICATE) link - (Annexure4)

Download Annexure 4

MANDATORY PROVISION FOR SITE VISIT- INSPECTION - CHECKLIST (BEFORE GRANTING OCCUPANCY/ COMPLETION CERTIFICATE)

Download Mandatory Provision

112

COMPUTERIZED SYSTEM FOR IDENTIFYING BUILDING / AREA THAT NEEDS TO BE INSPECTED BASED ON RISK ASSESSMENT

Through the 'Computerized Allocation of Inspector' the Application for granting Occupancy / Completion certificate is allocated to Inspector. Inspector need to conduct Site visits fulfilling the provisions of Site visit in the Building Byelaws

Risk Management System

Risk Assessment Report

113

INSPECTION REPORTS (within 48 hours to the Department after Site visit before granting Occupancy/ Completion Certificate)

A system has been developed internally. Once the Allotee apply for the obtaining construction permit, the Inspection shall be done as per the Mandate. An office order has been issued for online submission of inspection report within 48 hours to the Department.

Download Annexure 102

114

INSPECTION REPORTS (of Past Two Years)

A system has been developed internally. Once the Allotee apply for the obtaining construction permit, the Inspection shall be done as per the Mandate. The Inspection Report after Site Inspection before obtaining Construction Permit shall be uploaded on website within 48 hours. Allottee / Establishment has to login with his ID number and can find his inspection report in the property column. The report can also be downloaded from there.

115

PROCEDURE OF THE COMPUTERIZED ALLOCATION OF INSPECTORS

Download Annexure 3

213

VACANT LAND LIST

List of Vacant Plots

214-215

GIS LAND BANK

For GIS system, National Informatics Centre (NIC) New Delhi has developed the GIS solution, which can be seen on the link below:

GIS System / Application

216

OBJECTIVE CRITERIA

Download Annexure 6

217

PROCEDURE OF LAND ALLOTMENT FOR INDUSTRIAL PLOTS

Download Annexure 7

RATE LIST OF INDUSTRIAL ALLOTMENT

Download Annexure 8

LIST OF DOCUMENTS REQUIRED FOR LAND ALLOTMENT FOR INDUSTRIAL PLOTS

Download Annexure 9

LIST OF INDUSTRY WHICH MAY BE PERMITTED IN INDUSTRIES

Download List of Permissible Industries

218

TIMELINES FOR PROCESSING OF APPLICATION OF LAND ALLOTMENT FOR INDUSTRIAL PLOTS

Download Document

Download Document

219

ONLINE PAYMENT PROCEDURE FOR LAND ALLOTMENT FOR INDUSTRIAL PLOTS

A land allotment system is developed that allows online application and payment without the need for a physical touch point for document submission and verification and mandate that all applications are submitted online.

Download Annexure 219

220

Ensure that the system allows users to download the final signed land allotment certificate from the online portal

A system that allows users to dowload the final signed land allotment certificate from the online portal has been developed, in which the user can find their signed land allotment certificate from the YEIDA website, once the allotment is finalized.

Download Annexure 220

LIST OF ALLOTMENTS UNDER INDUSTRIES link (s)-

http://www.yamunaexpresswayauthority.com/aind01

http://www.yamunaexpresswayauthority.com/aind02

http://www.yamunaexpresswayauthority.com/aind0324717

http://www.yamunaexpresswayauthority.com/oes

221

LIST OF ALLOTMENT UNDER INDUSTRIES and SEARCH OPTIONS WITH ALLOTMENT NUMBER AND NAME DETAILS link-(list of all industry in Mis) and picture perform-for your help

LIST OF SURRENDER DETAILS OF SECTOR 32 and 33

http://www.yamunaexpresswayauthority.com/asur24717

222

PROCESSING OF APPLICATION FOR CONVERSION OF LAND / CHANGE IN LAND USE FOR LAND OUTSIDE OF INDUSTRIAL PARKS/ IDCs

The Authority prepares the Master Plan, acquires land for development and demarcates the land for different uses in the master plan under the provisions of the UP Industrial Area Development Act 1976. The Authority carries out development activities as per the Master Plan. As per the present policy of the Authority, the entire proposed urbanizable area is to be developed by the Authority itself. Conversion of land use for private land owners is not permissible. If in future, any such provision is made. It shall be informed through public notice.

223

A Comprehensive formal building code applicable to the YEIDA area

BUILDING BYELAWS: Download Building Byelaws

224

UNIFORM BUILDING CODE/ BUILDING BY-LAW INCLUDES PROVISIONS FOR RISK-BASED CLASSIFICATION OF BUILDINGS

APPENDIX 8A, 8B, 8C

Download Annexure 13

APPENDIX 12

Download Annexure 14

225

UNIFORM BUILDING CODE/ BUILDING BY-LAW INCLUDES ACCREDITATION PROGRAMS AND CLEAR RESPONSIBILITIES FOR PROFESSIONALS INCLUDING ARCHITECTS AND ENGINEERS ENGAGED IN THE CONSTRUCTION PROCESS

APPENDIX 12

Download Annexure 14

CHAPTER II, POINT NO. 17.0- CANCELLATION OF PERMIT FOR BUILDING ACTIVITY

Download Annexure 15

226

MANDATORY QUALIFICATIONS FOR ARCHITECTS, STRUCTURAL ENGINEERS IN THE UNIFORM BUILDING BY-LAWS

APPENDIX 12

Download Annexure 14

227
The Master Plan 2021 and 2031 has been approved

MASTER PLAN 2021

Master Plan 2021

MASTER PLAN 2031

Master Plan 2031

228

A DEDICATED CONFLICT RESOLUTION MECHANISM FOR LAND AND CONSTRUCTION PERMITS

Core group of Officer formed for conflict resolution:-

Download Letter no. YEA/CEO/103/2015 dated 24.02.2015

231

Architects are not authorized to issue the completion certificate for Industrial Plots. Authority scrutinize the documents, Drawings etc. Before issuing completion certificate.

232

Third Party certification of structural design should be either by Indian Institute of Technology/N.I.T, or any other recognized technical institutes.

233

Combine all affidavits & undertakings required to be submitted for obtaining the building plan approval into one affidavit/undertaking

No Affidavits is required for building plan approval, only an endemity bond is submitted in case of construction of Basement.

234
LIST OF DOCUMENTS REQUIRED FOR OBTAINING BUILDING PLAN APPROVAL

The comprehensive list of documents required for Building Plan approval are mentioned in the links below:

For Industrial Plots

Download List of Documents

For Temporary Structure

Download for Temporary Structure

For Sanction/Approval of Layouts and Sub-Division

Download for Sanction/Approval

PROCEDURE FOR BUILDING PLAN APPROVAL

Annexure 20

235

TIMELINE FOR SANCTION OF BUILDING PLANS FOR INDUSTRIAL PLOTS

Download Annexure 19

Download Document

236

'Single Joint Site Inspection' - Office order no. Z-46/492/2016 dated 06/05/2016 - order for 'Single Joint Site Inspection'

Download Office Order

237

Design and develop an online single window system for granting construction permits with following functionalities:

i. A common integrated application for all internal and external agencies required to provide applicable NOCs / Approvals such as Fire services, water body, Discoms, AAI, NMA, Forest, Labour, Factory Directorate etc.

For Common Integrated Application decision shall be taken at government level.

ii. Provision for making an online application with integrated payment without the need for a Physical touch point for document submission and verification. LINK PROCEDURE OF SUBMITTING APPLICATION FOR BUILDING PLAN APPROVAL ONLINE link - (Annexure 20)

Download Annexure 20

iii. For scrutinizing the online submitted building plan, the Plans to be submitted in AutoCAD format. So, the Building Plan can be scrutinized properly.

Download Annexure 18

iv. TIMELINE FOR SANCTIONING OF BUILDING PLANS

Download Annexure 19

Download Document

v. TIMELINE FOR SANCTIONING OF BUILDING PLANS

Download Annexure 19

Download Document

vi. INSPECTION REPORT - (CURRENTLY POSSESSION OF INDUSTRIAL PLOTS ARE NOT GIVEN TO ALLOTTEE, SO UNTILL NOW, NO INSPECTION HAS BEEN CONDUCTED)

vii. An 'Online Building Plan Approval/ Sanction Interface' has been developed and executed, where Applicant can submit the drawings, Appendix and other required documents. The Online Payment gatewayis link to this 'Online Building Plan Approval System' so that Applicant can pay directly using Payment gateway.

PROCEDURE OF SUBMITTING APPLICATION FOR BUILDING PLAN APPROVAL ONLINE

Download Annexure 20

The system shall issue digitally signed completion certificate.

Office Order for Digitally Signed Letters

238

TIMELINE FOR SANCTIONING OF BUILDING PLANS

Download Annexure 19

Download Document

239
Stipulate that construction permits, are provided within 45 days

(i) Building Plan approval is provided within 30 days:
The Sanctioning of building permit shall be within 15 working days from the date of application for the plots sizes upto 40000 sq.m. and for plots sizes above 40000 sq.m. Sanctioning of building permit shall be within 30 working days.

Download Annexure 19

ii. Plinth inspection is done within 7 days of intimation
Once the application is received online for obtaining construction permit / Plan approval, the list of applicant are shown in the internal system which is called 'ComputerizedAllocation of Inspectors' in which the applications are randomly allocated to inspectors which will be their assigned project. And after the 7 days of receiving the application, the system automatically will assign the date of Plinth inspection to the inspector.

PROCEDURE OF THE COMPUTERIZED ALLOCATION OF INSPECTORS

Download Annexure 3

iii. Final completion / occupancy certificate is provided within 8 days (7 days for inspection + 1 day for issuing the completion)
Once the plans are scrutinized and inspection is done, the objection if required shall be sent to the applicant and as soon as the objections are resolved, the certificate shall be issued. The Sanctioning of building permit shall be within 15 working days from the date of application for the plots sizes upto 40000 sq.m. and for plots sizes above 40000 sq.m. Sanctioning of building permit shall be within 30 working days.

LINK TIMELINE FOR SANCTIONING OF BUILDING PLANS

Download Annexure 19

240

The list of approved industrial building plans for at least past two years shall be available for third parties verification.

A system has been developed in which third parties can easily verify the approval certificates in the public domain. Once the Allotee apply for the building plan approval, the approval certificate shall be made available on the YEIDA website for third parties verification.

304

Procedure and Comprehensive list of all documents that are required for providing water connection in urban and industrial area is mentioned.

LIST OF DOCUMENTS REQUIRED FOR OBATINING WATER CONNECTION

Download

PROCEDURE OF OBTAINING WATER CONNECTION

Download

305

A Timeline for obtaining water connection is mentioned

TIMELINE FOR OBTAINING WATER CONNECTION

Download

Download Document

306

PROCEDURE OF OBTAINING WATER CONNECTION

An integrated system has been developed for online procedure of water and sewer connection has been developed which is mentioned in the link below:

Download Annexure 306

Download Document